Pneumatic Gatefold Installation Instructions For Baum 2018, 2020 Pile & Continuous Feed Folder models This manu
10
Send test samples and look for inside “dog ears” or damaged edges to the inside edges. These are a signal that the timing needs to be adjusted. Do not
1-800 543-6107 Baumfolder Corporation 1660 Campbell Rd. Sidney, OH 45365 12
Inspect shipment carefully for any damage immediately. If freight damage occurs, contact the freight carrier immediately. Do not discard crating mate
1. Install mounting post to feeder frame on the non-operator side of the folder. Drill (2) ¼ inch or 6.5mm diameter clearance holes in the frame as sh
4. Remove wire #13L1 from the side of Auxiliary contact block K2. Move this wire up to the open side of terminal 12L1 on the terminal strip TB-1.
7. Install the gatefold foldplate in the #4 foldplate position. Make sure that there is no interference. Turn the handwheel on the folder to check. If
To set the control panel readout for proper machine size and language, perform the following: 1. Press the main power button in the lower left-hand
Setting up a Job to test. It is important to set up a gatefold job (1) step at a time. Work from the feeder forward. Make your setup procedure the
4. Reinstall foldplate #2 and have it set to deflect the paper. Leave #4 position open without a foldplate. Set foldplate #3 open to folding to make
9 9
Kommentare zu diesen Handbüchern